No | Name of Work | Sub Scope of Work | Location | Client | Scope of Work | Year of Work |
---|---|---|---|---|---|---|
392 | Feasibility Study Update for PLTU Tanjung Saud 2 x 100 MW | Consultant Service | Center Sumatera | PT. Panbil Utilitas Sentosa | Feasibility Study | 2020 |
1 | Belinyu Coal Fired Steam Power Plant 2 x 12 MW | Consultant Service | Belinyu - Bangka | PT Kutilang Paksi Mas | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
2 | Kupang Coal Fired Steam Power Plant 2 x 15 MW | Consultant Service | Kupang - East Nusa Tenggara | PT Indonesia Power - ELNUSA | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
3 | Palu Coal Fired Steam Power Plant 2 x 15 MW | Consultant Service | Palu - Central Sulawesi | PT Indonesia Power | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
4 | Grati Blok III Gas Turbine Power plant 740 MW | Consultant Service | Grati - East Jawa | PT Mitsa Guna Cita | Feasibility Study include Mechanical, Electrical, and Civil Study | |
5 | Bangka, Sorong, Palu and Kendari Mini Scale Coal Fired Steam Power Plant | Consultant Service | Bangka, Sorong, Palu and Kendari | PT PLN Enjiniring | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study, Batymetri and Resirkulation | |
6 | Prabumuli and Soka Gas Engine Power Plant | Consultant Service | South Sumatera | PT PLN Enjiniring - Elnusa | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
7 | Baturaja Coal Fired Steam Power Plant 2 x 25 MW | Consultant Service | Baturaja - South Sumatera | PT PLN Enjiniring - Astratel | Pre - Feasibility Study | |
8 | Bangka Coal Fired Steam Power Plant 2 x 7 MW | Consultant Service | Air Anyer - Bangka | PT bangka Power | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
9 | Loa Janan Coal Fired Steam Power Plant 2 x 25 MW | Consultant Service | Loajanan - East Kalimantan | PT baramulti Sugih Sentosa | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
10 | keban Agung Coal Fired Steam power Plant 2 x 100 MW | Consultant Service | Keban Agung - South Sumatera | PT Priamanaya | Feasibility Study and Bid Document for Tender | |
11 | Coal Fired Steam Power Plant mini Scale | Consultant Service | CCIT - FTUI | Resirkulation Study | ||
12 | Lombok Coal Fired Steam Power Plant | Consultant Service | Lombok - West Nusa Tenggara | PT. Bismika Muria Persada | Document Preparation for EPC Tender & Evaluation Tender | |
13 | Kalimantan Coal Fired Steam Power Plant | Consultant Service | South Kalimantan - East Kalimantan | PT. PLN Proyek Induk Pembangkit dan Jaringan Kalimantan | Interconnection and Transmission Study | |
14 | Tanjung Pinang Coal Fired Steam Power Plant 2 x 10 MW | Consultant Service | Tanjung Pinang | PT Indonesia Power | Preparation Proposal for Tender | |
15 | Belitung Coal Fired Steam Power Plant 2 x 6 MW | Consultant Service | Riau | PT Indonesia Power | Preparation Proposal for Tender | |
16 | Kupang Coal FiredSteam Power Plant 2 x 15 MW | Consultant Service | Kupang - East Nura Tenggara | Konsorsium Power Elektrindo | Feasibility Study and Preparation Proposal for Tender | |
17 | Palu Coal Fired Steam Power Plant 2 x 10 MW | Consultant Service | Palu - Central Sulawesi | Konsorsium Inerpowerindo | Feasibility Study and Preparation Proposal for Tender | |
18 | Belitung Coal Fired Steam Power Plant 2 x 6 MW | Consultant Service | Riau | Konsorsium Power Elektrindo | Feasibility Study and Preparation Proposal for Tender | |
19 | Tanjung Pinang Coal Fired Steam Power Plant 2 x 10 MW | Consultant Service | Tanjung Pinang | Konsorsium Inerpowerindo | Feasibility Study and Preparation Proposal for Tender | |
20 | Baturaja Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | Baturaja - South Sumatera | Konsorsium Cogindo DB - Metaepsi | Pre Feasibility Study and Preparation Proposal for Tender | |
21 | Lombok Coal Fired Steam Power Plant 2 x 25 MW | Consultant Service | Lombok -West Nusa Tenggara | Konsorsium Cogindo DB - Jembo Energindo | Pre Feasibility Study and Preparation Proposal | |
22 | Pontianak Coal Fired Steam Power Plant2 x 25 MW | Consultant Service | Pontianak - West Kalimantan | Konsorsium Cogindo DB - Jembo Energindo | Feasibility Study and Preparation Proposal | |
23 | Bima Coal Fired Steam Power Plant 2 x 6 MW | Consultant Service | Bima - West Nusa Tenggara | Konsorsium Cogindo DB - Jembo Energindo | Feasibility Study and Preparation Proposal | |
24 | Gorontalo Coal Fired Steam Power Plant 2 x 6 MW | Consultant Service | Gorontalo | Walinusa Energi | Preparation Proposal for Tender | |
25 | MUSI II Gas Engine Power Plant 2 x 6 MW | Consultant Service | Musi - SouthSumatera | PT PLN Enjiniring | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
26 | kramasan Combined cycle power plant 2 x 100 MW | Consultant Service | Kramasan - South Sumatera | PT Energi Musi Makmur | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
27 | Semen Cibinong Coal Fired Steam Power Plant | Consultant Service | Cilacap - Central Java | PT Semen Cibinong | Correction of Power Factor and Interconnection | |
29 | Sungailiat, Bangka Coal Fired Steam Power Plant 2 x 15 MW | Consultant Service | Riau | PT Handaru Para Samya | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
30 | Tarahan Unit 1 Coal Fired Steam Power Plant 2, 2 x 110 MW | Consultant Service | South Sumatera | PT Adhi Karya (JO) | Bid Proposal and RFP for Power Plant Supplier | |
31 | Sako dan Sekayu Gas Engine Power Plant 2 x 6 MW dan 2 x 8,7 MW | Consultant Service | South Sumatera | PT PLN Enjiniring | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
32 | Feasibility Study CCGT Power Plant Project in Bontang - Kalimantan | Consultant Service | East Kalimantan | PT East Asia Power Indonesia | Feasibility Study | |
33 | Majene Coal Fired Steam power Plant 2 x 15 MW | Consultant Service | West Sulawesi | PT Duta Nusa Energy | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
34 | Musi Rawas Coal Fired STeam Power Plant 4 x 100 MW | Consultant Service | South Sumatera | PT Sriwijaya Bintang Tiga Energi | Pre Feasibility Study and Preparing PPA Document | |
35 | Prabumulih Coal Fired Steam Power Plant 2 x 600 MW | Consultant Service | Prabumulih - South Sumatera | PT Tansri Madjid Energi | Pre Feasibility Study dan Preparation for PPA Document | |
36 | Lombok Coal Fired Steam Power Plant 2 x 25 MW | Consultant Service | Lombok - East Nusa Tenggara | Maser Power Producer Ltd | Full Feasibility Study with Topography, | |
37 | Pontianak Coal Fired Steam Power Plant 2 x 25 MW | Consultant Service | Pontianak - East Kalimantan | Maser Power Producer Ltd | Full Feasibility Study with Topography | |
38 | Kupang Coal Fired Steam Power Plant2 x 15 MW | Consultant Service | Kupang - East Nusa Tenggara | PT Indonesia Power | Preparation for Tender Proposal | |
39 | Tanjung Batu Mine Mouth Coal Fired Steam Power Plant 2 x 25 MW | Consultant Service | Tanjung Batu - East Kalimantan | PT Indonesia Power | Full Feasibility Study with Topography, Geology and Tender Document | |
40 | Nunukan Coal Fired Steam Power Plant 2 x 6 MW | Consultant Service | Nunukan - East Kalimantan | PT Indonesia Power | Full Feasibility Study with Topography, Geology and Tender Proposal | |
41 | Batubara Coal Fired Steam Power Plant 2 x 7 MW | Consultant Service | Bone - Gorontalo | PT Walinusa Energi | Feasibility Study | |
42 | Pinrang Coal Fired Steam PowerPlant 2 x 15 MW | Consultant Service | Pinrang - South Sulawesi | PT Pinrang Power Indonesia | Full Feasibility Study with Topography, Geology and Environmental Study | |
43 | Cikarang - Jababeka Combined Cycle Power Plant 80 MW | Consultant Service | Cikarang - JABABEKA | PT Iroda Mitra | Full Feasibility Study with Topography, Geology and Environmental Study | |
44 | Padang Coal Fired Steam Power Plant 2 x 50 MW | Consultant Service | Padang - South Sumatera | PT Radiant Nusa Investama | Full Feasibility Study with Topography, Environmental Study | |
45 | Ampelgading Hydro Electric Power Plant | Consultant Service | Ampelgading - East Java | PT Cegelec | Desain seluruh peralatan mekanikal dan elektrikal | |
47 | Rembang dan Tanjung Jati Coal Fired Steam Power Plant | Consultant Service | Rembang - Central Java | Consortium Zelan - Priamanaya - Tronoh (021-52903940) | Consultancy Services for Bid Proposal Preparation | |
48 | Suralaya Coal - Fired Steam Turbine Power Plants 1 x 600 MW | Consultant Service | Suralaya - Banten | Consortium Shanghai Electric Group - Maxima Infra Struktur | Preparing bid Proposal Document | |
49 | Bayung Lencir Coal FiredSteam Power Plant 2 x 150 MW | Consultant Service | Bayung Lencir - South Sumatera | PT Manggala Ekawana Lestari (021-39834473) | Pre Feasibility Study | |
50 | Kuala Tanjung Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | Kuala Tanjung - North Sumatera | PT Pacific Oil & Gas | Detail EPC Cost and Financial Analysis | |
51 | Jayapura Coal Fired Steam Power Plant 2 x 12 MW | Consultant Service | Jayapura - Papua | PT Tenaga Listrik Jayapura (021 7253666) | Full Feasibility Study with Topography, Geology and Environmental Study | |
52 | Lati Berau Coal Fired Steam Power Plant 2 x 7 MW) | Consultant Service | Berau - East Kalimantan | PT Indo Pusaka Berau | Full Feasibility Study with Topography, Geology and Environmental Study | |
53 | Feasibility Study MFONISASI PLTD Ampenan Sektor Lombok | Consultant Service | Ampenan - West Nusa Tenggara | PT PLN Wilayah NTB | Full Feasibility Study with Enterprise Risk Management | |
54 | Tanjung Pinang Coal Fired Steam Power Plant 2 x 12 MW | Consultant Service | Tanjung Pinang - RIAU | PT Tenaga Listrik Tanjung Pinang | Full Feasibility Study with Topography, Geology and Environmental Study | |
55 | Karang AsemCoal Fired Steam Power Plant 2 x 100 MW | Consultant Service | Karang Asem - Bali | PT Maxima Infrastruktur | Pre Feasibility Study | |
56 | Cepu Combined Cycle Power Plant 500 MW | Consultant Service | Cepu - Central Java | PT Indonesia Power (021 5267666) | Full Feasibility Study with Topography, Geology | |
57 | Tanjung Enim Coal Steam Power Plant Mini Scale | Consultant Service | Tanjung Enim - South Sumatera | PT Bukit Asam (Persero) (021 5254014) | Full Feasibility Study with Study Pra Amdal, Fuel Study | |
58 | JABABEKA COmbined Steam Power Plant 130 MW JABABEKA - Cikarang | Consultant Service | JABABEKA | PT BEKASI POWER | Feasibility Study | |
59 | Cirebon class Coal Fired Steam Power Plant 600 MW | Consultant Service | Cirebon - West Java | PT Cirebon Electric Power (021 750-0701) | Pre Feasibility Study | |
60 | Kutai Timur Coal Fired Steam Power Plant 2 x 7 MW Kutai Timur | Consultant Service | Kutai Timur - East Kalimantan | PT Vellini Kutim Energi | Full Feasibility Study with Topography, Geology and Environmental Study | |
61 | Pekerjaan Jasa Engineering Perkuatan Jaringan SUTT 70 kV Pekalongan - Sukamerindu Sirkit 1 dan 2 dari Konduktor ACSR 185 mm2 menjadi TACSR 185 mm2 | Consultant Service | Pekalongan -Central Java | PT PLN (PERSERO) | Jasa Engineering Perkuatan Jaringan SUTT 70 kV Pekalongan - Sukamerindu Sirkit 1 dan 2 dari Konduktor ACSR 185 mm2 menjadi TACSR 185 mm2 | |
62 | Pipanisasi Crude Oil - jambi | Consultant Service | Central Sumatera | PT Sakti Petrogas Jambi | Pre Feasibility Study | |
63 | JABABEKA Combined Cycle Power Plant | Consultant Service | JABABEKA | PT Indo Fuji Energi | Preparing Document Contract for Combined Sycle Power Plant of JABABEKA | |
64 | Jelitik Coal Fired Steam Power Plant 2 x 15 MW | Consultant Service | Industry State Jelitik - Liat River, Bangka Belitung | PT Handaru Para Samya | Feasibility Study and discussion about PPA | |
65 | Paiton Combined Cycle Power Plant 300 MW | Consultant Service | Paiton - East Java | PT PLN PJB | Design Fire Fighting System for Paiton Coal Fired Steam Power Plant | |
66 | Ampenan Diesel Power Plant MFO 2 x 7,5 MW | Consultant Service | Ampenan - West Nusa Tenggara | PT PLN Wilayah NTB (0370 643123) | Full Feasibility Study with Topography, Geology and Environmental Study | |
67 | Larantuka Coal Fired Steam Power Plant 2 x 7 MW | Consultant Service | Larantuka - East Nusa Tenggara | PT Truba Alam Manunggal Engineering | Pre Feasibility Study | |
68 | Pontianak Coal Fired Steam Power Plant 2 x 25 MW | Consultant Service | Pontianak - West Kalimantan | PT Equator Manunggal Power | Full Feasibility Study with Topography, Soil Investigation, Geology and Environmental Study | |
69 | Muara Enim Coal Steam power Plant 2 x 135 MW | Consultant Service | Muaraenim - South Sumatera | PT Energi Musi Makmur | Feasibility Study | |
70 | Kuala Tanjung Coal steam Power Plant 2 x 112,5 MW | Consultant Service | Kuala Tanjung - North Sumatera | PT Ranyza Energi | Feasibility Study | |
71 | Banyuasin Coal Fired Steam power Plant 2 x 135 MW | Consultant Service | Banyuasin - South Sumatera | PT Banyuasin Power Energy | Feasibility Study | |
72 | Bangka Coal Fired Steam Power Plant 2 x 10,5 MW | Consultant Service | Bangka | PT Bangka Manunggal Power | Feasibility Study | |
73 | Tarakan Coal Fired StamPower Plant 2 x 15 MW | Consultant Service | Tarakan - East Sumatera | PT PLN E | Pre Feasibility Study | |
74 | Kutai Barat Coal Fired Steam Power Plant 2 x 10 MW | Consultant Service | Kutai Barat - East Kalimantan | PEMDA DAERAH KUBAR | Full Feasibility Study with Topography, Geology and Environmental Study | |
75 | Bayung Lencir Coal Fired steam Power Plant 2 x 150 MW | Consultant Service | Bayung Lencir - Soth Sumatera | PT Manggala Ekawana Lestari (021-39834473) | Feasibility Study | |
76 | Quality Assurance and Quality Control Services for Package 3 | Supervision Service | Labuhan - Banten | PT SNC Lavalin (021 5203528) | Quality Assurance and Quality Control Service for Labuahn Banten CFSPP Construction Supervision | |
77 | Distribution Lines Study Bekasi Power Cikarang to KIIC and Delta Mas | Consultant Service | Kawasan Industri JABABEKA Phase III | PT Bekasi Power | Study Interconnection + | |
78 | JABABEKA Interconnection bussines plan | Consultant Service | JABABEKA | PT BEKASI POWER | Interconnection Study | |
79 | Binuang Rantau Coal Fired Steam Power Plant 2 x 65 MW | Consultant Service | Binuang rantau - South Kalimantan | PT Cipta Prima Power | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
80 | Badas Coal Fired Steam Power Plant 2 x 15 MW | Consultant Service | Badas - West Nusa Tenggara | PT Misi Mulia Metrical 021 57938886) | Pre Feasibility Study | |
81 | Sicanang Gas Turbine Power Plant 120 MW | Consultant Service | Sicanang - North Sumatera | Konsorsium PT Menamas - PT Betasurya - PT Sakti Mas Mulia | Detail Engineering Dessign for Mechanical, Civil, and Electrical | |
82 | Sicanang Gas Turbine Power Plant | Consultant Service | Sicanang - North Sumatera | PT Intan Prima Kalorindo | Detail Design and Supervision of Cooling System GE Frame 9 PLTG Sicanang - Sumatera Utara | |
83 | Pendopo and Tatakan Coa Fired Power Plant 2 x 15 MW | Consultant Service | Pendopo South Sumatera and Tatakan South Kalimantan | PT baramulti Sugih Sentosa | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
84 | Labuhan Angin Coal Fired Steam | Consultant Service | Labuhan Angin - North Sumatera | PT PLN E | Commisioning Supervision | |
85 | Keban Agung - lahat Coal Fired Steam Power Plant | Consultant Service | Keban Agung - Lahat South Sumatera | PT Priamanaya Energi | Transmission Line Study | |
86 | Boom baru Gas Engine PowerPlant 2 x 7 MW | Consultant Service | Palembang - South Sumatera | PT Sarana Pembangunan Palembang Jaya | Preparing for Document Tender and assistance for the Auction | |
87 | Muara Kedihin Mini Hydro Power PLant | Consultant Service | Muara Kedihin - South Kalimantan | PT PLN (PERSERO) Proyek Induk Pembangkit dan jaringan Kalimantan | Review and updating Feasibility Study | |
88 | Senipah Gas Turbine Power Plant 2 x 40 MW | Consultant Service | Senipah - East Kalimantan | PT Kutai Energi | Studi Kelayakan Lengkap dengan Pekerjaan Topografi, Geologi dan Studi Lingkungan UKL/UPL | |
89 | Interconnection Study PT Sasa Inti | Consultant Service | Gending Probolinggo - East Java | PT Sasa Inti | Analysis Study about failed and Interconnection Study | |
90 | Cirebon Coal Fired Steam power Plant 1 x 600MW | Consultant Service | Cirebon - West Java | PT Cirebon Electric Power (021-57973010) | Feasibility Study | |
91 | Tanjung Balai Karimun Coal fired Steam Power Plant | Consultant Service | Tanjung Balai Karimun -Riau | PT PLN Persero Proyek Induk SUMBAGUT | Supervision Construction | |
92 | Lancang, Aceh Studi Kelayakan Gas Turbin Power Plant 3 x 22 MW Power Plant | Consultant Service | Aceh - North Sumatera | PT Trang Bumi Nanggroe Aceh | Feasibility Study , Ukl - UPL, Visual Inspection, Inspection Report | |
93 | Bahari Coal Fired Steam Power Plant | Consultant Service | North Sumatera | PT Erka Anugrah Pratama | Engineering services for Preparing Engineering Opinion & Judgement of Owner Engineering Basic Design to PPA Proposal - CP | |
94 | Muara Kedihin Mini Hydro power Plant | Consultant Service | PT PLN (Persero) | Review Feasibility Study | ||
96 | Nunukan Coal Fired Steam Power Plant 2 x 7 MW | Consultant Service | East Kalimantan | MASER (M) Sdn Bhd | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
97 | Lati Coal Fired Steam Power Plant 2 x 7 MW | Consultant Service | East Kalimantan | PT Indo Pusaka Berau | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
98 | Kutai Barat Coal Fired Steam power Plant 3 x 5 MW | Consultant Service | East Kalimantan | SDF Power Generation SDN BHD | Full Feasibility Study with Topography, Geology and UKL/UPL Environmental Study | |
99 | Bakrie Power Combined Cycle PoweR Plant Ex China | Consultant Service | PT. Bakrie power | Engineer Service | ||
100 | Tatakan Coal dired Steam Power Plant 2 x15 MW | Consultant Service | South Kalimantan | PT baramulti Sugih Sentosa | Updating Feasibility Study from 2 x 15 MW to 2 x 7 MW | |
101 | Kema - Bitung Coal Fired steam Power Plant 2x25 MW | Consultant Service | North Sulawesi | PT Kerabat Prima Abadi | Pre Feasibility Study | |
102 | Kaltim Coal Fired steam power Plant 2 x 100 MW Kalimantan Timur | Consultant Service | East Kalimantan | PT Bakrie Power | Feasibility Study | |
103 | Kundur - Pangkal Pinang Coal Fired Steam power Plant 2 x 5 MW | Consultant Service | Bangka Belitung | PT Timah | Feasibility Study | |
104 | Block Siak Coal Fired Steam Power Plant | Consultant Service | Riau | Badan Operasi Bersama PT Bumi Siak Pusako - Pertamina Hulu | Preparing Front end Engineering Design (FEED) | |
105 | Kariangau - Balik Papan Industry State | Consultant Service | BalikPapan - East Kalimantan | PT Kariangau Power | Study Interconnection tarif for industry state | |
106 | Pontianak 1 Diesel Power Plant (30 MW) and Pontianak 2 Diesel Power Plant (20 MW) Sei Raya, Pontianak - Kalimantan Barat | Consultant Service | West Kalimantan | PT ARTI DUTA ANEKA USAHA | Study optimilization Construction | |
107 | Tanjung Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | South Kalimantan | PT JASA POWER INDONESIA | Pre Feasibility Study | |
108 | Malinau Combined Cycle Power Plabt 2 x 3.5 MW Kaltim | Consultant Service | East Kalimantan | PT BENUO TAKA ENERGY | Revision for Feasibility Study | |
109 | Kariangau - Balik Papan Coal Fired Steam Power plant2 x 15 MW | Consultant Service | South Kalimantan | PT Kariangau Power | Feasibility Study | |
110 | Krakatau Combined Cycle Power Plant120 MW | Consultant Service | South Sumatera | PT FERROSTAAL | Feasibility Study | |
112 | Lati Coal Fired Steam Power Plant 2 x 7 MW | Consultant Service | Kalimantan | PT Indo Pusaka Berau | Supervisi Turnkey Project Pekerjaan Pembangunan Boiler Baru PLTU Lati Kapasitas 40 ton/jam, Tekanan 3,82 MPA dan Temperature 4500C | |
113 | Karingau Coal Fired Power Plant 2 x 15 MW, | Consultant Service | South Kalimantan | PT Kariangau Power | Engineering Service Comprises Detail Design Review & Drawing Approval For Kariangau | |
114 | Lampung Coal Fireed Steam Power Plant | Consultant Service | South Sumatera | PT PP (Persero) | Preparing Bid Document Inquiry, Preparing Contract Document EPC | |
115 | Klara Mini Hydro Power Plant | Consultant Service | North Sulawesi | PT Exsabenar Cipta Karya | Feasibility Study | |
116 | Kema Coal Fired Steam Power Plant 2 x 30 MW | Consultant Service | North Sulawesi | PT Sakti Mas Mulia | Feasibility Study | |
117 | Padang Mini Hydro Power Plant 1500 kW | Consultant Service | North Sulawesi | PT Pembangkit Listrik Induring | Feasibility Study | |
118 | Kaltim-2 Coal Fired Steam power Plant 2 x 100 MW | Consultant Service | East Kalimantan | PT Bakrie Metal Industries & Korea East-West Power Co.Ltd | Pre Feasibility Study and Bid Proposal Works Letter of Intent For Engineering Services | |
119 | Nusa Penida Coal Fired Steam Power Plant 1 x 10 MW CFSPP Bali | Consultant Service | Bali | Goldrich Holding Inc. | Feasibility Study | |
120 | Pemaron Baru Combined Cycle Power Plant 126 MW | Consultant Service | Bali | Elnusa | Request for Quotation-Purchase Order Service FS Report of | |
121 | Keban Agung Coal Fired Steam Power Plant 2 x 135 MW | Consultant Service | South Sumatera | PT. Primanaya Energy | Preparing Technical Specification of Additional Equipment | |
122 | Jeneponto Coal Fired Steam Power Plant 2 x 125 MW | Consultant Service | South Sulawesi | PT. Bosowa Energi | Feasibility Study | |
123 | Tabalar Mini Hydro Power Plant | Consultant Service | East Kalimantan | PT. Indo Pusaka Berau | Supervision Construction and UKL UPL | |
124 | Sungai Lariang Hydro Power Plant | Consultant Service | Central Sulawesi | PT. Bumi Power Energi | Potential Study | |
125 | Bangli Biomass Power Plant 1.5 MW | Consultant Service | Bali | PT. Charta Putra Indonesia | Feasibility Study | |
126 | Banjaran Mini Hydro Power Plant 2 x 1100 KW, Logawa Mini Hydro Power Plant 2 x 930 KW and Logawa Mini Hydro Power Plant 2 x 670 KW | Consultant Service | West Java | PT. True North Bridge | Review and Updating Feasibility study | |
127 | Sabak Gas Turbine Power Plant 25 MW, Tanjung Jabung Timur | Consultant Service | Central Sumatera | PT. Mega Energi Nusa | Pre Feasibility Study | |
128 | Bicoli Mini Hydro Power Plant | Consultant Service | North Maluku | PT. True North Capital | Pre Feasibility Study | |
129 | Coal Fired Steam Power Plant 2 x 100 MW in Central Kalimantan | Consultant Service | Central Kalimantan | PT. Astratel Nusantara | Pre Feasibility Study | |
130 | Wajo Gas Engine Power Plant 3 x 7.7 MW | Consultant Service | South Sulawesi | PT. Makmur Mandiri Langgeng | Pre Feasibility Study | |
131 | aek Kamangin Mini Hydro Power Plant | Consultant Service | North Sumatera | PT. Nusantara Powerindo Perkasa | Feasibility Study | |
132 | Lariang Hydro Power Plant 18 MW - Sigi | Consultant Service | Central Sulawesi | PT. Bumiraya Hidro Listrik | Feasibility Study | |
133 | Tongguran III Mini Hydro power Plant 2 x 500 KW | Consultant Service | North Sumatera | PT. Nusantara Powerindo Perkasa | Feasibility Study | |
135 | Wajo Gas Engine Power Plant 3 x 7.74 MW | Consultant Service | South Sumatera | PT. Makmur Mandiri Langgeng | Revision of Capacity | 2013 |
136 | Cirebon Expansion Project | Consultant Service | West Java | PT. Marubeni | Feasibility Study | 2013 |
137 | Lati unit 3 Coal Fired Steam Power plant 2 x 7 MW | Consultant Service | East Kalimantan | PT. Indo Pusaka Berau | Supervision Construction | 2013 |
138 | Keban Agung Coal Fired Steam Power Plant | Consultant Service | South Sumatera | PT. Primanaya Energy | Preparing Implementation Schedule | 2013 |
139 | Coal Fired Steam Power Plant | Consultant Service | South Sumatera | PT. Swarna Daya Persada | Pre Feasibility Study | 2013 |
140 | Nabire Coal Fired steam power Plant 2 x 7 MW | Consultant Service | Papua | PT. Adiquatro Elektrikindo Perkasa | Feasibility Study | 2013 |
141 | East Kalimantan Coal Fired Steam Power Plant 2 x 2.75 MW | Consultant Service | East Kalimantan | PT. Rekadaya Elektrika Consult (RECONSULT) | Tender Document for EPC | 2013 |
142 | 6 Lokation of Mini Hydro power Plant | Consultant Service | Central Sulawesi | PT. Bumiraya Utama | Potential Study | 2013 |
143 | Mokoe Mini Hydro Power Plant 9.9 MW Sigi | Consultant Service | Central Sulawesi | PT. Bumi Power Energi | Feasibility Study | 2013 |
146 | Bangli Biomass Power Plant 1.5 MW | Consultant Service | Bali | PT. Charta Putra Indonesia | Feasibility Study | 2013 |
147 | Dumai Coal Fired Steam Power Plant 2 x 15 MW | Consultant Service | Riau | PT. Dabi Power Plant | Feasibility Study | 2013 |
148 | Matoa Coal Fired sTeam Power Plant 2 x 15 MW | Consultant Service | Papua | PT. Daya Kencana Mas | Feasibility Study | 2013 |
149 | Merauke Biomass Power Plant10 MW Papua | Consultant Service | Papua | Medco Group - LG International Consortium | Review Preparing Proposal and Technical Assistance | 2013 |
150 | Ulumbu Bio Thermal Power Plant 2 x 2.5 MW | Consultant Service | East NusaTenggara | PT. Wasa Mitra Engineering | Detail Engineering Design Installation Supervision & AS Build Drawing | 2013 |
152 | TarakanCoal Fired Steam Power Plant 2 x 25 MW | Consultant Service | East Kalimantan | PT. Prakarsa Ekatam Edvisory | Feasibility Study | 2013 |
153 | Pembangunan Boiler Circulated Fluidized Bed KApasitas 40 T/J Tekanan 3.82 Mpa & Temperatur 450'C | Consultant Service | East Kalimantan | PT. indo Pusaka Berau | Preparing Auction Document & Evaluation Tender for construction Boiler Circulated Fluidized Bed auction | 2014 |
154 | Kalimantan Biomass Power Plant 2 X 3.5 MW | Consultant Service | East Kalimantan | PT. Mega Hijau Lestari | Feasibility Study | 2014 |
155 | Bantaeng Zamrut Industry State Coal Fired Steam Power Plant PLTU 2X300 MW International | Consultant Service | South Sulawesi | PT. Bantaeng Sigma Energi | Feasibility Study | 2014 |
156 | Gorontalo Biomass Power Plant | Consultant Service | North Sulawesi | PT. Nagata Bima Shakti | Feasibility Study | 2014 |
157 | Muara Karang Combined Cycle Power Plant 450-500 MW | Consultant Service | north Jakarta | PT. PLN (Persero) Pusenis | Feasibility Study | 2014 |
158 | Tabalar Mini Hydro Power Plant | Consultant Service | East Kalimantan | PT. Cahaya Energy | Feasibility Study | 2014 |
159 | Sumsel 1 Coal Fired Steam Power Plant 2X300 MW | Consultant Service | South Sumatera | PT. Bhina Mitra Usaha Persada | Feasibility Study | 2014 |
160 | Kendari-3 IPP Coal Fired Steam Power Plant 2X50 MW | Consultant Service | Southeast Sulawesi | PT. DSSP Power Sakti | Pre Feasibility Study | 2014 |
161 | Penyusunan Kaji Kelayakan Pebangunan Kebun Energi Termasuk Survey Lokasi Gorontalo | Consultant Service | North Sulawesi | Lembaga Swadaya Masyarakat "Yayasan Reka Hijau" | Feasibility Study | 2014 |
164 | Baturaja Coal Fired Steam Power Plant | Consultant Service | South Sumatera | PT. Semen Baturaja (Persero) | Feasibility Study | 2014 |
165 | Pekanbaru Combined Cycle Power Plant 240 MW | Consultant Service | Riau | PT. Sarana Pekanbaru Energi | Feasibility Study | 2014 |
166 | OKI Selapan Jaya Biomass-Biogas Power Plant 2 MW | Consultant Service | South Sumatera | PT. AES Agriverde Indonesia | Study of Amdal UKL-UPL | 2014 |
167 | Tambak Lorok 3 Coal Fired Steam Power Plant | Consultant Service | Central Java | PT. Indonesia Power | Gasification and rehabilitation | 2014 |
168 | OKI Permata Bunda Biomass-Boigas Power Plant 2 MW | Consultant Service | South Sumatera | PT. AES Agriverde Indonesia | Study of Amdal UKL-UPL | 2014 |
169 | Jambi Gas Engine Power Plant 50 MW Jambi | Consultant Service | Central Sumatera | PT. AES Agriverde Indonesia | Detail Engineering | 2014 |
171 | Jujuhan Coal Fired Steam Power Plant 2x150 MW | Consultant Service | Central Sumatera | PT. Golden Energy Mines Tbk | Pre Feasibility Study | 2014 |
172 | Bengkulu Coal Fired Steam Power Plant 2x100 MW | Consultant Service | West Sumatera | PT. Kutilang Paksi Mas | Pre Feasibility Study | 2014 |
173 | Makassar Industry State Coal Fired Steam power Plant 2x30 MW | Consultant Service | South Sulawesi | PT. Alamigas Mega Energi | Feasibility Study | 2014 |
174 | Lahat Mine Mouth Coal Fired Steam Power Plant 2x50 MW | Consultant Service | South Sumatera | PT. Golden Great Borneo | Feasibility Study | 2014 |
175 | Keban Agung Coal Fired Power Plant 2x135 MW | Consultant Service | South Sumatera | PT. Priamanaya Energi | Finalization Report | 2014 |
176 | Tambak lorok Coal Fired Steam Power Plant 1x200 MW | Consultant Service | Central Java | PT. Indonesia Power | Gasification and Rehabilitation | 2014 |
177 | Jeneponto Coal Fired Steam power Plant 2x125 MW | Consultant Service | South Sulawesi | PT. Bosowa Energi | Feasibility study | 2014 |
178 | Ogan Komering Ilir Biomass Power Plant 430 MW - 710 MW | Consultant Service | South Sumaterae | PT. OKI Pulp & Paper Mills | Pre Feasibility Study | 2015 |
179 | Kendari-3 Coal Fired Steam Power Plant 2x50 MW | Consultant Service | Southeast Sumatera | PT. DSSP Power Sakti | Feasibility Study | 2015 |
180 | Morowali Tsinghan Coal Fired Steam Power Plant | Consultant Service | Central Sulawesi | PT. Sulawesi Mining Investment | Engineering Plant Condition Assessment & Plant Life, asisstance for IUPTL danSLO Industrial Estate Launching | 2015 |
181 | Mentawai Biomass Power Plant 2 x 200 kW 3 lokasi | Consultant Service | West Sumatera | PT. Charta Putra Indonesia | Feasibility Study | 2015 |
182 | Siak Combined Cycle Power Plant | Consultant Service | Riau | PT. Bumi Siak Pusako | P:re Feasibility Study | 2015 |
183 | Jambi Gas Engine Power Plant | Consultant Service | Central Sumatera | PT. Max Power Indonesia | Feasibility Study | 2015 |
184 | Kendari 3 Coal Fired Steam Power Plant 2 x 50 MW | Consultant Service | Southeast Sulawesi | PT. DSSP Power Sakti | Feasibility Study | 2015 |
185 | Jayapura Coal Fired Steam Power Plant 2 x 15 MW | Consultant Service | Papua | PT. Tenaga Listrik Matoa | Feasibility Study | 2015 |
186 | Rancana Sinergi dalam Proyek Pembangkit listrik 35.000 MW | Consultant Service | PT. Bimasakti Balai Sinergi | Memorandum of understanding | 2015 | |
187 | Musi Banyuasin Coal Fired Steam Power Plant | Consultant Service | South Sumatera | PT. DSSP Power Mas Utama | Feasibility Study | 2015 |
188 | Sumbagsel-1 Coal Fired Steam Power Plant | Consultant Service | South Sumatera | PT. SSP-PJB-D&C-Aps Consortium | Feasibility Study | 2015 |
189 | Munipical Waste Power Plant Solo | Consultant Service | Central Java | PT. Mitrabara Adiperdana Tbk | Pre Feasibility Study | 2015 |
190 | Sijunjung Hydro Power Plant 2 x 3.825 MW | Consultant Service | West Sumatera | PT. ISIS Megah | Pre Feasibility Study | 2015 |
191 | Berau Coal Fired Steam Power Plant 7 MW | Consultant Service | East Kalimantan | Pt. Indo Pusaka Berau | Feasibility Study | 2015 |
192 | Megatron Project | Consultant Service | Borang, Bali, Aceh | PT. Sari Prima Energi | Due Diligence | 2015 |
193 | JambCoal Fired Steam Power Plant 2 x 600 MW | Consultant Service | Central Sumatera | PT. Wahana Putra Margaswadaya | Project Summary Report | 2015 |
194 | Bhinamitra Coal Fired Steam Power Plant 2 x 300 MW | Consultant Service | South Sumatera | PT. Bhina Mitra Usaha Persada | Pre Feasibility Study | 2015 |
195 | Katingan Mine Mouth Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | Central Kalimantan | PT. Goku Resources | Pre Feasibility Study | 2015 |
196 | Tanjung Balai Karimun Coal Fired Steam Power Plant 2x7 MW | Consultant Service | Riau | PT. PLN (Persero) Unit Induk Pembangunan I | Supervision Cunstruction | 2015 |
197 | PKalimantan Coal Fired Steam Power Plant 2x27.5 MW | Consultant Service | East Kalimantan | PT. Indo Ridlatama Power | Enjiniring Survey Lokation and Relayout | 2015 |
198 | Sulut-3 Coal Fired Steam Power Plant | Consultant Service | North Sulawesi | PT. Bukit Berlian Energi | Feasibility Study | 2015 |
199 | Aceh Utara Gas Turbine Power Plant 2x50 MW, Medan Labuhan 2x50 MW, Rembang Gas Turbine Power Plant 2x50 MW, Cepu Gas Turbine Power Plant 12 MW | Consultant Service | North Sumatera | PT. Energi Indonesia Bersama | Pre Feasibility Study | 2015 |
200 | Sanga-sanga Coal Fired Steam Power Plant 2x27.5 MW | Consultant Service | South Kalimantan | PT. ATPK Power Resources | Pre Feasibility Study | 2015 |
201 | Jambi Mine Mouth Coal Fired Steam Power Plant 2x600 MW | Consultant Service | Central Sumatera | PT. Gunung Karang Manunggal | Pre Feasibility Study | 2015 |
202 | Bengkulu Coal Fired Steam Power Plant 2x100 MW | Consultant Service | Bengkulu | PT. Injatama | Pre Feasibilty Study | 2015 |
203 | Batam Gas Engined Power Plant 4x12 MW, Kuala Tanjung Coal Fired Steam Power Plant 2x150 MW, Dumai Coal Fired Steam Powere Plant 2x150 MW, Gas Turbine Power Plant 480 MW | Consultant Service | Batam | PT. Kuala Bara Perkasa | Fasibility Study | 2015 |
204 | Padang Combined Cycle Power Plant | Consultant Service | West Sumatera | PT. Piesta Dinamika Consult | Fasibility Study for Construction technic project | 2015 |
205 | Kembang Janggut Coal Fired Steam Power Plant 2x100 MW, Kutai Kartanegara | Consultant Service | East Kalimanan | PT. Aditya Kirana Mandiri | Feasibility Study | 2015 |
206 | Maros Coal Fired Steam Power Plant 2x40 and WHRG 20 MW | Consultant Service | South Sulawesi | PT. Bosowa Energasindo | Feasibility Study | 2015 |
207 | Cirebon Expansion Project (660 MW & 2.000 MW) | Consultant Service | West Java | Axia Power Holdings B.V. | Faesibility Study | 2015 |
208 | Mentawai Biomass Power Plant 3 location | Consultant Service | West Sumatera | MCA-I & PT. Charta Putra Indonesia | Feasibility Study | 2015 |
209 | Lati Coal Fired Steam Power Plant 2x7 MW | Consultant Service | East Kalimantan | PT. Usaha Bangun Bersama | Feasibility Study | 2015 |
210 | Tamiang Layang Coal Fired Steam Power Plant 2x100 MW | Consultant Service | Central Kalimantan | PT. Gunung Karang Manunggal | Pre Feasibility Study | 2015 |
211 | Dumai Gas Turbine Power Plant 250 MW | Consultant Service | Riau | PT. Riau Perkasa Energi | Feasibility Study | 2015 |
212 | Inhil Gas Engined Power Plant 25 MW, Indragiri Hilir | Consultant Service | Riau | PT. Riau Perkasa Energi | Feasibility Study | 2015 |
213 | West Kalimantan Biomass Power Plant | Consultant Service | West Kalimantan | PT. Kalindo Central Accord | Feasibility Study | 2015 |
214 | Lamandau Biomass Power Plant 2x5 MW | Consultant Service | Central Kalimantan | PT. Pusaka Jaya International | Pre Feasibility Study | 2015 |
215 | Pre Feasibility Study Document Preparations For Beauty Contest and PPA of Jambi Mine Mouth Coal Fired Steam Power Plant CFSPP 2x600 MW | Consultant Service | Central Sumatera | Best Global Inko Consortium | Pre Feasibilitty Study | 2015 |
216 | Barito Utara Coal Fired Steam Power Plant 2x100 MW | Consultant Service | Central Kalimantan | PT. Borneo Utama Power | Pre Feasibility Study | 2015 |
217 | Lati Coal Fired Steam Power Plant2x25 MW Berau | Consultant Service | East Kalimantan | PT. Indo Pusaka Berau | Feasibility Study | 2015 |
218 | Buntok Baru Biomass Power Plant 5x10 MW | Consultant Service | East Kalimantan | PT. Austral Byna Energi | Feasibility Study | 2015 |
219 | Consultancy agreement pre feasibility study of jambi mine mouth CFSPP 2x600 MW | Consultant Service | Central Sumatera | PT. Anugrah Prima Coalindo | Pre Feasibility Study | 2015 |
220 | Lombok Utara Gas Turbine Power Plant 130 MW | Consultant Service | East Nusa Tenggara | PT. Nusantara Energy Power | Feasibility Study | 2015 |
221 | Curup Gangsa Mini Hydro Power Plant 2 x 600 kW | Consultant Service | South Sumatera | PT. Megaraja Satria Energy | Pre Feasibiliti Study | 2015 |
222 | Bekasi Coal Fired steam Power Plant 2x1000 MW | Consultant Service | West Java | PT. Pembangkit Jabar Utama | Pre Feasibility Study | 2015 |
223 | Deli Serdang Biomass Power Plant 1 x 9,9 MW | Consultant Service | North Sumatera | PT. Cipta Energi Lestari | Preparing IUPTL Document | 2015 |
224 | Bogor Municipal Waste Power Plant 2x20 MW | Consultant Service | West Java | PT. Prayoga Pertambangan Energi | Feasibility Study | 2015 |
225 | Jambi Mine Mouth Coal Fired Steam Power Plant 2x300 MW | Consultant Service | Central Sumatera | PT. Bangun Energy Indonesia | Pre Feasibility study | 2015 |
226 | Batulicin Mine Mouth Coal Fired Steam Power Plant 2x100 MW | Consultant Service | South Kalimantan | PT. Jhonlin Energi Kalimantan | Feasibility Study | 2015 |
227 | Sumsel-1Biomass Power Plant 1x9.8 MW | Consultant Service | South Sumatera | PT. Nelly Energi Lestarindo | Feasibility Study | 2015 |
228 | Pemaron Combined Cycle Power Plant Assesment | Consultant Service | Bali | PT. Indonesia Power | Assesment | 2015 |
229 | Berau Coal Fired Steam Power Plant 2 x 7 MW | Supervision Service | North Kalimantan | PT. Indo Pusaka Berau | Assesment | 2015 |
230 | Morowali Tsinghan Industrial Estate Combine Cycle Power Plant | Consultant Service | Central Sulawesi | PT.Sulawesi Mining Investment | Plant Conditional Assesment | 2015 |
231 | OKI Biomass Power Plant | Consultant Service | South Sumatera | PT. OKI Pulp & Paper Mills | Pre Feasibility Study | 2015 |
232 | Lahat Mine Mouth Coal Fired Steam Power PLant 2 x 50 MW | Consultant Service | South Sumatera | PT. Golden Great Borneo | Feasibility Study | 2015 |
233 | Kendari 3 Coal Fired Steam Power Plant 2 x 50 MW | Consultant Service | Southeast Sulawesi | PT. DSSP Power Sakti | Feasibility study | 2015 |
234 | Sijunjung Hydro Power Plant 2 x 3,825 MW | Consultant Service | West Sumatera | PT. ISIS Megah | Pre Feasibility Study | 2015 |
235 | Jambi Gas Engine Power Plant | Consultant Service | Central Sumatera | PT. Bukit Berlian Energi | Pre Feasibility Study | 2015 |
236 | Siak Combined Cycle Power Plant | Consultant Service | Riau | PT. Bumi Siak Pusako | Pre Feasibility Study | 2015 |
237 | Bangka Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | Bangka Belitung | PT. Trisurya Lintas Elektrika | Complete Feasibility Study | 2015 |
238 | Sumsel 1 Coal Fired Steam Power Plant | Consultant Service | South Sumatera | PT. Bhina Mitra Usaha Persada | Feasibility Study | 2015 |
239 | Sumbagsel 1 Coal Fired Steam Power Plant 2 x 150 MW | Consultant Service | South Sumatera | PT. D & C Engineering | Pre Feasibility Study | 2015 |
240 | Sulbagut 3 Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | North Sulawesi | PT. Bukit Berlian Group | Feasibility Study | 2015 |
241 | Sulbagut 2 Coal Fired Steam Power Plant 2 x 50 MW | Consultant Service | North Sulawesi | PT. Bukit Berlian Group | Feasibility Study | 2015 |
242 | Toli-toli Coal Fired Steam Power Plant 2 x 25 MW | Consultant Service | Central Sulawesi | PT. Bukit Berlian Group | Feasibility Study | 2015 |
243 | Katingan Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | Central Kalimantan | PT. Goku Resource | Pre Feasibility Study | 2015 |
244 | Jambi Coal Fired Steam Power Plant 2 x 150 MW | Consultant Service | Central Sumatera | PT. Jambi Power | Pre Feeasibility Study | 2015 |
245 | Borang Gas Turbine Power Plant 60 MW, Rengat Gas Engine Power Plant 20 MW | Consultant Service | Riau | PT. Sari Prima Energi | Engineering Service of Due Diligence | 2015 |
246 | Cirebon Coal Fired Steam power Plant 3 x 660 MW | Consultant Service | West Java | PT. Axia Power Holding B.V | Feasibility Study | 2015 |
247 | Cirebon Coal fired Steam Power Plant 2 x 1000 MW | Consultant Service | West Java | PT. Axia Power Holding B.V | Feasibility Study | 2015 |
248 | Tamiang Layang Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | South Kalimantan | PT. Rimau Elektrik | Pre Feasibility Study | 2015 |
249 | Medan Labuan Gas Turbine Power Plant 2 x 50 MW | Consultant Service | North Sumatera | PT. Energi Indonesia Bersama | Feasibility Study | 2015 |
250 | Aceh Utara Gas Turbine Power Plant 2 x 50 MW | Consultant Service | North Sumatera | PT. Energi Indonesia Bersama | Feasibility Study | 2015 |
251 | Rembang Gas Turbine Power Plant | Consultant Service | Central Java | PT. Sumber Energi Sukses Makmur | Feasibility Study | 2015 |
252 | Sulut 3 Coal Fired Steam Power Plant 2 x 50 MW | Consultant Service | North Sulawesi | PT. Bukit Berlian Energi | Feasibility Study | 2015 |
253 | Jambi Coal Fired Steam Power Plant 2 x 600 MW | Consultant Service | Central Sumatera | PT. Jambi Power Lestari | Feasibility Study | 2015 |
254 | Cepu Gas Engine Power Plant 1 x 12 MW | Consultant Service | North Java | PT. Sumber Energi Sukses Makmur | Feasibility Study | 2015 |
255 | Matotonan Biomass Power Plant 2 x 200 kW | Consultant Service | West Sumatera | PT. Charta Putri Indonesia | Feasibility Study | 2015 |
256 | Madobag Biomass Power Plant 3 x 200 kW | Consultant Service | West Sumatera | PT. Charta Putri Indonesia | Feasibility Study | 2015 |
257 | Saliguma Biomass Power Plant 2 x 200 kW | Consultant Service | West Sumatera | PT. Charta Putri Indonesia | Feasibility Study | 2015 |
258 | Kembang Janggut Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | North Kalimantan | PT. Aditya Kirana Mandiri | Pre Feasibility Study | 2015 |
259 | Jayapura Coal Fired Steam Power Plant 2 x 15 MW | Consultant Service | Papua | PT. Tenaga Listrik Matoa | Feasibility Study | 2015 |
260 | Musi Banyuasin Coal Fired Steam Power Plant 2 x 300 MW | Consultant Service | South Sumatera | PT. DSSP Power Mas Utama | Feasibility study | 2015 |
261 | Berau Coal Fired Steam Power Plant 7 MW | Consultant Service | East Kalimantan | PT. Indo Pusaka Berau | Feasibility Study | 2015 |
262 | Jambi Coal Fired Steam Power Plant 2 x 600 MW | Consultant Service | Central Sumatera | PT. Wahana Putra Margaswadaya | Project Summary Report | 2015 |
263 | Tanjung Balai Karimun Coal Fired Steam Power Plant 2 x 7 MW | Supervision | Riau | PT. PLN Persero Unit Pembangunan | Supervision | 2015 |
264 | North Kalimantan Coal Fired Steam Power Plant 2 x 27,5 MW | Consultant Service | North Kalimantan | PT.Indo Ridlatama Power | Survey and reLayout Location | 2015 |
265 | North Sulawesi 3 Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | North Sulawesi | PT. Bukit Berlian Energi | Feasibility Study | 2015 |
266 | Sanga-Sanga Coal Fires Steam Power Plant 2 x 27,5 MW | Consultant Service | North Kalimantan | PT. ATPK Power Resource | Pre Feasibility Study | 2015 |
267 | Jambi Mine Mouth Coal Fired Steam Power Plant 2 x 600 MW | Consultant Service | Central Sumatera | PT. Gunung Karang Manunggal | Feasibility Study | 2015 |
268 | Bengkulu Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | West Sumatera | PT. Injatama | Feasibility Study | 2015 |
269 | Batam Gas Engine Powe Plant 4 x 12 MW | Consultant Service | Riau | PT. Kuala Bal Perkasa | Feasibility Study | 2015 |
270 | Kuala Tanjung Coal Fired Steam Power Plant 2 x 150 MW | Consultant Service | North Sumatera | PT. Kuala Bala Perkasa | Feasibility Study | 2015 |
271 | Dumai Coal Fired Steam Power Plant 2 x 150 MW | Consultant Service | Riau | PT. Kuala Bala Perkasa | Feasibility Study | 2015 |
272 | Panaran Gas Turbine Power Plant 480 MW | Consultant Service | Riau | PT. Kuala Bala Perkasa | Fesaibility Study | 2015 |
273 | Padang Gas Turbine Power Power Plant | Consultant Service | West Sumatera | PT. Piesta Dinamika Consult | Feasibility Study | 2015 |
274 | Maros Coal Fired Steam Power Plant 2 x 40 MW | Consultant Service | South Sulawesi | PT. Bosowa Energasindo | Feasibility Study | 2015 |
275 | Lati Coal Fired Steam Power Plant 2 x 7 MW | Consultant Service | East Kalimantan | PT. Usaha Bangun Bersama | Feasibility Study | 2015 |
276 | Tamiang Layang Coal Fired Steam Power Plant | Consultant Service | South Kalimantan | PT. Gunung Karang Manunggal | Feasibility Study | 2015 |
277 | Dumai Gas Turbine Power Plant 250 MW | Consultant Service | Riau | PT. Riau Perkasa Energi | Feasibility Study | 2015 |
278 | Inhil Gas Engine Power Plant 25 MW | Consultant Service | Riau | PT. RIau PErkasa Energi | Feasibility Study | 2015 |
279 | West Kalimantan Biomass Power Plant | Consultant Service | West Kalimantan | PT. Kalindo Central Accord | Feasibility Study | 2015 |
280 | Lamandau Biomass Power Plant 2 x 5 MW | Consultant Service | Central Kalimantan | PT. Pusaka Jaya International | Pre Feasibility Study | 2015 |
281 | Jambi Coal Fired Steam Power Plant 2 x 600 MW | Consultant Service | Central Sumatera | PT. Best Global Inko Consortium | Pre Feasibility Study | 2015 |
282 | Barito Utara Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | South Kalimantan | PT. Borneo Utama Power | Pre Feasibility Study | 2015 |
283 | Lati Coal Fired Steam Power Plant 2 x 25 MW | Consultant Service | East Kalimantan | PT. Indo pusaka Berau | Pre Feasibility Study | 2015 |
284 | Buntok Baru Biomass Power Plant 5 x 10 MW | Consultant Service | Central Kalimantan | PT. Austral Byna Energi | Feasibility Study | 2015 |
285 | Jambi Mine Mouth Coal Fired Steam Power Plant 2 x 300 MW | Consultant Service | Central Sumatera | PT. Anugrah Prima | Pre feasibility Study | 2015 |
286 | Lombok Utara Gas Turbine Power Plant 130 MW | Consultant Service | West Nusa Tenggara | PT. Nusantara Enegi Power | Feasibility Study | 2015 |
287 | Bekasi Coal Fired Steam Power Plant 2 x 1000 MW | Consultant Service | West Java | PT. Pembangkit Jabar Utama | Feasibility Study | 2015 |
288 | Deli Serdang Biomass Power Plant | Consultant Service | North Sumatera | PT. Cipta Multi Listrik Nasional | Preparing IUPTL Document | 2015 |
289 | Batulicin Mine Mouth Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | South Kalimantan | PT. Johnlin Energi Kalimantan | Feasibility Study | 2015 |
290 | Suth Sumatera 1 Biomass Power Plant 1 x 9,8 MW | Consultant Service | South Sumatera | PT. Nelly Energi Lestarindo | Feasibility Study | 2015 |
291 | Jambi Mine Mouth Coal Fired Steam power Plant 2 x 300 MW | Consultant Service | Central Sumatera | PT. Bangun Energi Indonesia | Pre Feasibility | 2015 |
292 | Bogor Municipal Waste Power Plant | Consultant Service | West Java | PT. Prayoga Pertambangan energi | Feasibility Study | 2015 |
293 | Curup Gangsa Hydro Power Plant | Consultant Service | South Sumatera | PT. Megaraja Satria Energi | Pre Feasibility Study | 2015 |
294 | Barru Coal Fired Steam Power Plant 2 x 50 MW | Consultant Service | South Sulawesi | PT. Indonesia Powers | Assesment | 2015 |
295 | Sumbawa Biomass Power Plant 2 x 1000 MW | Consultant Service | West Nusa Tenggara | PT. Elnusa Tbk. | Feasibility Study | 2015 |
296 | Pontianak Biomass Power Plant 1 x 9,8 MW | Consultant Service | West Kalimantan | PT. Kalindo Central Accord | Feasibility Study | 2015 |
297 | Toli-toli Hydro Power Plant | Consultant Service | Central Sulawesi | PT. Royce Energi Indonesia | Pre Feasibility Study | 2015 |
298 | Cogen Baturaja Coal Fired Steam Power Plant 4 MW | Consultant Service | South Sumatera | PT. Semen Baturaja | Feasibility Study | 2015 |
299 | Gorontalo Coal Fired Steam Power Plant 1 x 6,5 MW | Consultant Service | Gorontalo | PT. Bukit Berlian Energi | Feasibility Study | 2015 |
300 | Lalindu Hydro Electric Power Plant 50 MW | Consultant Service | South East | PT. Global Inti Perdana | Feasibility Study | 2016 |
301 | Deli Sedang Biomass Power Plant 1 x 9,9 MW | Consultant Service | North Sumatera | PT. Cipta Multi Listrik Nasional | Full Feasibility Study | 2016 |
302 | Lati Add On Boiler Coal Fired Steam Power Plant 7 MW | Consultant Service | East Kalimantan | PT. Indo Pusaka Berau | Tender Document | 2016 |
303 | Dumai Gas Turbine Power Plant 2 x 50 MW | Consultant Service | Riau | PT. Kuala Bala Perkasa | Feasibility Study | 2016 |
304 | Gresik Gas Turbine Power Plant (IPP PLN) | Consultant Service | East Java | PT. Kuala Bala Perkasa | Feasibility Study | 2016 |
305 | Jonggol Gas Turbine Power Plant 3 x 600 MW | Consultant Service | West Java | PT. Trika Huadian Engineering | Feasibility Study | 2016 |
306 | Bengkulu Coal Fired Steam Power Plant 2 x 100 MW | Consultant Service | Bengkulu | PT. Gunung Karang Manunggal | Upgrading from Pre Feasibiliti Study to | 2016 |
307 | Berau Coal Fired Steam Power Plant 2 x 7 MW | Consultant Service | East Kalimantan | PT. Indo Pusaka Berau | Supervision | 2016 |
308 | Palu Coal Fired Steam Power Plant Phase 1 2 x 13,5 and 2 x 15 MW | Consultant Service | Central Sulawesi | PT. Pusaka Jaya International | Due Diligence | 2016 |
309 | Tarakan Coal Fired Steam Power Plant | Consultant Service | North Kalimantan | PT. Poyry Indonesia | System Study | 2016 |
310 | Berau Biomass Power Plant 9,9 MW | Consultant Service | East Kalimantan | PT. Berau Power Inernational | Feasibility Study | 2016 |
311 | Sancang Wind Turbine Power Plant | Consultant Service | West Java | PT. EGERES energi | Pre Feasibility Study | 2016 |
312 | Nabire Coal Fired Steam Power Plant 2 x 7 MW | Consultant Service | Papua | PT. Nabire Sumber Energi | Full Feasibility Study | 2016 |
313 | Manokwari Coal Fired Steam Power Plant 2 x 7 MW | Consultant Service | Papua | PT. Mudajay Energy Indonesia | Full Feasibility Study | 2016 |
314 | Tanjung Morawa Gas Turbine Power Plant 250 MW | Consultant Service | North Sumatera | Consortium Trimate CDK | Pre Feasibility Study | 2016 |
315 | South Kalimantan Coal Fired Steam Power Plant 2 x 50 MW | Consultant Service | South Kalimantan | PT. Mitra Daya Tama Prima | Pre Feasibility Study | 2016 |
316 | Waduk Darma Hydro Power Plant 2 MW | Consultant Service | West Java | PT. Darma Daya Mandiri | Feasibility Study | 2016 |
317 | Bengkulu Coal Fired Steam Power Plant | Consultant Service | Bengkulu | PT. Indo Power Plant Resource | Feasibility Study | 2016 |
318 | Ngabang Biomass Power Plant | Consultant Service | West Kalimantan | PT. Kalindo Central Accord | Feasibility Study | 2016 |
319 | South Sumatera Coal Fired Steam Power Plant 2 B | Consultant Service | South Sumatera | PT. DSSP Power Sumsel 2 | Feasibility Study | 2016 |
320 | Jambi IPP Gas Turbine Power Plant 250 MW | Consultant Service | Central Sumatera | PT. United Century Engineering | Feasibility Study | 2016 |
321 | Komunal Municipal Waste Power Plant | Consultant Service | South Sulawesi | PT. Prestasi Multi Kerasi | Feasibility Study | 2017 |
322 | Lampung Coal Fired Steam Power Plant 2 x 30 MW | Consultant Service | South Sumatera | PT. Sepoetih DAya Prima | Pre Feasibility Study | 2017 |
323 | Pemalang Coal Fired Steam Powe Plant 1000 MW | Consultant Service | Central Java | PT. Power Plant Indonesia | Pra Feasibility Study | 2017 |
324 | Cilaki & Cibataruah Hydro Power Plant | Consultant Service | West Java | PT. Dharma Pratama Sejati | Financial Model | 2017 |
325 | Asam-asam Biomass Power Plant | Consultant Service | South Kalimantan | PT. Kalindo Central Goautama | Feasibility Study | 2017 |
326 | Tayan Biomass Power Plant | Consultan Service | North Kalimantan | PT. Kalindo Centra Accord | Feasibilty Study | 2017 |
327 | Yogyakarta Substation | Consultant Service | DI Yogyakarta | PT. Handasa Konsultant | Preparing Tender Document | 2017 |
328 | Sumbawa Coal Fired Steam Power Plant | Consultant Service | NTB | KORBI | Interconnection Study | 2017 |
329 | Sintang Biomass Power Plant 10 MW | Consultant Service | West Kalimantan | PT. Intika Accord Power | Feasibility Study | 2017 |
330 | Jambi Coal Fired Steam Power Plant | Consultant Service | Jambi | PT. POYRY Indonesia | Power System Study | 2017 |
331 | Yapen Biomass Power Plant 10 MW | Consultant Service | Papua | PT. Sinar Wijaya Plywood | Feasibility Study | 2017 |
332 | Kalselteng Mine Mouth CFSPP 2 x 100 MW | Consultant Service | South Kalimantan | PT. Energi Prima Nusantara | Pre Feasibility Study | 2017 |
333 | Tender Document of Sumedang Substation | Consultant Service | Central Java | PT. Handasa Konsultan | Preparing Tender Document | 2017 |
334 | Tender Document of Cangkring Substation | Consultant Service | Central Java | PT. Handasa Konsultan | Preparing Tender Document | 2017 |
335 | Financial Analysis for Krakatau Daya Listrik | Financial Analysis | West Java | PT. Krakatau Daya Listrik | Financial Report | 2017 |
336 | Murata Mine Mouth CFSPP 2 x 300 MW | Consultant Service | Jambi | PT. Triaryani | Updating Pre Feasibility Study | 2017 |
337 | Dumai Combine Cycle Power Plant 250 MW | Consultant Service | Riau - Pekanbaru | PT. Riau Perkasa Energi | Updating Pre Feasibility Study | 2017 |
338 | Kintap Mine Mouth CFSPP 2 x 100 Mw | Consultant Service | Central Kalimantan | PT. Mitra Dayatama Prima | Full Feasibility Study | 2017 |
339 | Ground Mounted Solar Power Plant 2 MW | Consultant Service | Gunung Putri - West Java | PT Phoenix Solar Pte Ltd | Feasibility Study | 2017 |
340 | Sei Tubu Hydro Power Plant 300 MW | Consultant Service | North Kalimantan | PT Anugerah Hijau Powerindo | Upgrade FS, Site Investigation, Upto PPA | 2017 |
341 | Study Onn Grid & Off Grid 1000 Islands | Consultant Service | DKI Jakarta | PT Masagi Energi Solusindo | Feasibility Study | 2017 |
342 | Lalindu Hydro Power Plant 2 X 25 MW | Consultant Service | South East Sulawesi | PT Global Inti Perdana | Upgrade FS, Site Investigation, Up to PPA | 2017 |
343 | Curup Gangsa Hydro Power Plant 2 X 600 KW | Consultant Service | Lampung | PT Megaraja Satria Energi | Upgrade FS, Site Investigation, Upto PPA | 2017 |
344 | Buleleng Gas Turbine Power Plant 2 X 500 MW | Consultant Service | Bali | PT Power Plant Indonesia | Pre Feasibility Studi | 2017 |
345 | Relocation Tower for Pegangsaan Substation Kela pa Gading | Consultant Service | East Jakarta | PT Jakarta Tollroad Development | Study Basic Design | 2017 |
346 | Lariang Hydro Power Plant Electricity Grid System Study 200 MW | Consultant Service | Central Sulawesi | PT Energia Prima Nusantara | Electrical Study | 2017 |
347 | Inalum CFSPP 2 X 400 MW | Consultant Service | Riau | PT Sarida Utama | Project Summary | 2017 |
348 | Kaltengsel Expansion CFSPP 2 X 200 MW | Consultant Service | Central Kalimantan | PT DSSP Power Mas Utama | Feasibility Study | 2017 |
349 | Kendari Expansion CFSPP 2 X 150 MW | Consultant Service | South East Sulawesi | PT DSSP Power Mas Utama | Feasibility Study | 2017 |
350 | Jambi Expansion CFSPP 2 X 300 MW | Consultant Service | Jambi | PT DSSP Power Mas Utama | Feasibility Study | 2017 |
351 | Natuna Mobile Power Plant 20 MW | Consultant Service | Riau | PT Poyry Indonesia | Electrical Study | 2017 |
352 | Merauke Biomass Power Plant 1 X 3,5 MW | Consultant Service | Papua | PT Merauke Narada Energi | Feasibility Study, Site Investigation, Detail Engineering Design, Construction Supervision | 2017 |
353 | Floating Solar Power Plant and Land Base Waduk Sigura-gura& Resorvoir Tangga 400 MW | Consultant Service | North Sumatera | PT Sumber Energi Sukses Makmur | Feasibility Study | 2017 |
354 | Jambi CFSPP 2 X 300 MW | Consultant Service | Jambi | PT Bangun Energi Indonesia | Upgrade Feasibility Study | 2017 |
355 | ROW Transmission Line Gunung Tujuh CFSPP | Consultant Service | Riau | PT Salsabila Hydro Energi | Upgrade Feasibility Study | 2017 |
356 | Assessment for Force draft fan & induced draft fan condition for Ombilin CFSPP 2 X 100 MW | Consultant Service | West Sumatera | PT Prakarsa Putra Wiratama Sakti | Assessment | 2018 |
357 | Musi Banyuasin Gas Engine Power Plant 20 MW | Consultant Service | South Sumatera | PT Mitra Energi Persada | Feasibility Study | 2018 |
359 | Design Basis Report Foundation and Civil Structural Design Mill wideUpgrade Project Porsea | Consultant Service | North Sumatera | PT Tuba Pul Lestari | Detail Engineering Design & Feasibility Study | 2018 |
360 | Assessment for Tonasa CFSPP 2 X 25 MW | Consultant Service | Central Sulawesi | PT BNI Securitas | Assessment | 2018 |
361 | Service Agreement For Preparing Feasibility Study Combined Cycle Power Plant 500 MW In Aceh | Consultant Service | Special Region of Aceh | PT. Aksa Energi Uretim | Feasibility Study | 2018 |
362 | Feasibility Study of Kaltara Hydro Power Plant 200 MW | Consultant Service | North Kalimantan | PT. Anugerah Hijau Powerindo | Feasiblity Study | 2018 |
363 | Interconnection Study of Lalindu Hydro Power Plant 50MW | Consultant Service | North East Sulawesi | PT. Global Inti Perdana | Interconnection Study | 2018 |
364 | Pre Feasibility Study for Suluteng CFSPP | Consultant Service | North East Sulawesi | PT. Max Power Indonesia | Feasibility Study | 2018 |
365 | Feasibility Study of Wind Turbine Power Plant | Consultant Service | Garut - West Java | PT. Rancang Bangun Putra Nusantara | Feasibilty Study | 2018 |
366 | Feasibility Study of Bali Municipal Waste to Energy | Consultant Service | Bali | PT. Sunon (Hongkong) International | Feasibilty Study | 2018 |
367 | Feasibility Study and Interconnection Study of Sumbagsel CFSPP 2 x 150 MW | Consultant Service | South Sumatera | PT. Sumbagsel Energi Sakti Pewali | Feasiblity Study and Interconnection Study | 2018 |
368 | Engineering Services for Danau Anggi Hydro Pwer Plant | Consultant Service | Papua | PT. Dua Rajawali Proenergi | Project Summary, Pre Feasiblity Study, Feasibility Study | 2018 |
369 | Feasibility Study Tanjung Sauh CFSPP 2 x 100 MW | Consultant Service | Batam | PT. Panbill Utilitas Energi | Feasibility Study | 2018 |
370 | Engineering Services for Tower Relocation by PT PLN (Persero) Tower SUTT/SKTT 150 KV Kelapa Gading | Consultant Service | East Jakarta | PT. JTD Jaya Pratama | Supervision | 2019 |
371 | Feasibility Study for Ampah Kota CFSPP 2 x 100 MW | Consultant Service | Central Kalimantan | PT. Central Borneo Energi | Feasibilty Study | 2019 |
372 | Feasibility Study for Tanjung Kasam Expansion 2 X 55 MW | Consultant Service | Batam | PT. TJK Power | Feasibility Study | 2019 |
373 | Feasibility Study and Interconnection Study PLTU Keban Agung | Consultant Service | South Sumatera | PT. Priamanaya Energi | Feasibility Study and Interconnection Study | 2019 |
374 | Feasibility Study of Gas Infrastructure CNG Bangkanai | Consultant Service | Central Kalimantan | PT. Rekayasa Engineering | Feasibility Study | 2019 |
375 | Review and Evaluation Project Management Technic UB Biomass Power Plant Sei Mangkei | Consultant Service | North Sumatera | PT. LEN Industri (Persero) | Review and Evaluation | 2019 |
376 | Feasibility Study and Document Tender Training Service for PLN | Trainer Service | West Jakarta | STT PLN | Trainer | 2019 |
377 | Feasibility Study for Kutai Timur CFSPP 2 x 50 MW + 100 MW | Consultant Service | North Kalimantan | PT.Sekerat PErsada | Feasibility Study | 2019 |
378 | Management Service for land and Row 500 kV during TL Construction | Consultant Service | Jakarta | PT. Global Power Indonesia | Management Service | 2018 |
379 | Pekerjaan Proses Sertifikasi Tanah Tapak Tower Transmisi 150 kV Senipah | Consultant Service | East Kalimantan | PT. Kartanegara Energi Persada | Assistance | 2018 |
380 | EPC & Engineering Pengadaan pembuatan dan pemasangan sistem pengolah sampah mesin AWS di Semarang termasuk pemasangan Pembangkit Listrik Tenaga Surya | EPC Engineering | Central Java | Semarang State University | Fabrication | 2019 |
381 | Pengadaan mesin IPI AWS dengan pendingin udara sebanyak 2 unit | EPC Engineering | Central Java | PT. Putra Patra Utama | Fabrication | 2019 |
382 | Pengadaan mesin IPI AWS untuk Cebu Philipina sedbanyak 3 unit | EPC Engineering | Philipine | SUKI Trading Corporation | Fabrication | 2019 |
383 | Pengadaan Mesin IPI AWS 50 utk Grand Kamala Lagoon | EPC Engineering | Bekasi | PT. Enviro Total Solution | Fabrication | 2018 |
384 | Pengadaan Mesin IPI AWS utk Jepang | EPC Engineering | Japan | ETOPIRIKA LLC | Fabrication | 2018 |
385 | Construction Cost Estimation | Consultant Service | West Java | Black & Veatch, PT. Bina Viktori Indonesia | Construction Cost Estimate | 2019 |
386 | Feasibility Study Drafting for PLTA Panggong 110 MW Aceh | Consultant Service | North Sumatera | PT. Central Aceh Jaya Energi | Feasibility Study | 2019 |
387 | Feasibility Study Drafting | Consultant Service | West Java | PT Mitra Daya Nusantara | Feasibility Study | 2019 |
388 | Detailed Engineering Design for PLTM Penaraban 4,5 MW | Consultant Service | Center Java | PT. Laras Interior Asri | Detailed Engineering Design | 2019 |
389 | Interconnection Study Drafting for PLTA Karama 190 MW | Consultant Service | Central Jakarta | PT. DND Hydro Ecopower | Interconnection Study | 2020 |
390 | Technical Study for Project Rubby's Plant Assessment | Consultant Service | Central Jakarta | PT. Bahana Sekuritas | Technical Study for Plant Assessment | 2020 |
391 | Feasibility Study for PLTU Keban Agung 2 x 100 MW | Consultant Service | Central Jakarta | PT. Priamanaya Energi | Feasibility Study | 2020 |